Jubaili Bros. has established and maintained many major projects through out the Middle East, Africa and Central Asia. Major Projects have been carried out in Afghanistan, Kuwait, Lebanon, Nigeria, United Arab Emirates, Saudi Arabia, Iraq, Qatar, Syria, Pakistan and others. We are commited to ensure that every generator purchased from us reaches its intended location, is installed correctly and fulfills our customer expectations.    


Some of Jubaili Bros Projects:

Kuwait:

S.No. Project Name Project Description
1 US Army Camp 2 x 1250 KVA Soundproof
3 x 1000 KVA Synchronized
6 x 500 KVA Soundproof
7 x 500 KVA Soundproof @ 60 Hz
5 x 450 KVA Weatherproof @ 60 Hz
10 x 400 KVA Weatherproof @ 60 Hz
10 x 350 KVA Weatherproof
24 x 100 KVA Soundproof
2 US Army Camp 1 x 2000 KVA Soundproof
3 US Army Camp 3 x 500 KVA Soundproof and Synchronized
4 Viva Mobile Telecom Operator 165 x 30 KVA Soundproof with Battery Chargers and ATS (1+1) and (1+0) configuration
5 Kuwait National Petroleum Co. 1 x 400 KVA Soundproof
6 Fire Fighting Department 1 x 400 KVA
1 x 350 KVA
1 x 200 KVA
(all with Nickel Cadmiun Batteries and Options)
7 Kuwait Oil Co. 1 x 1000 KVA
1 x 400 KVA
8 Villas Tourism Plant 6 x 500 KVA in parallel for a total output of 3000 KVA Power Plant

Lebanon:

S.No. Project Name Project Description
1 Mekalless - Dyshonia, Beirut 1 x 375 KVA with ATS Panel
2 Casino Liban (Maameltein) 3 x 1250 KVA with Auto Synchronizing Panel 6200
3 Hospital Notre Dame De Secours 1 x 1100 KVA with ATS Panel
4 Hamshari Hospital 1 x 880 KVA with ATS Panel
5 Litani 1 x 880 KVA with ATS Panel
6 Victoria Centre / Dbayeh 1 x 880 KVA with ATS Panel
7 Beirut Sea Front 5 x 500 KVA with Synchronization system in parallel for a total output of 2500 KVA Power Plant
1 x 200 KVA
8 Villa Hjeij (Deir Antar) 3 x 500 KVA with Auto Synchronization Panel
9 Florika (Zahrani) 1 x 135 KVA
1 x 300 KVA
1 x 250 KVA
with auto Synchronizing Panel 6200
10 Solidere 1 x 200 KVA with Access 4000 auto start Control Panel

Nigeria:

S.No. Project Name Project Description
1 Murtala Mohammad Int'l Airport 4 x 1250 KVA Synchronized
2 MTN - Nigeria Communication Ltd 3 x 1250 KVA Soundproof (Inoyi switch)
1 x 1750 KVA Soundproof (Golden Plaza)
3 x 800 KVA Soundproof Synchronized (Maritime House)
3 Agip, Bonny Island 2 x 1000 KVA and 800 KVA Synchronized
4 Shell trustees 5 x 500 KVA Synchronized
5 Glass Factory 1 x 880 KVA with ATS Panel


United Arab Emirates:

S.No. Project Name Project Description
1 Fujairah International Airport 1 x 1500-1650 KVA with Sound Attenuated and Weatherproof Container and Automatic Transfer Switch
2 Dubai International Airport 2 x 100 KVA with Mobile Trailers
3 Sharjah Electricity and Water Authority 1 x 500 KVA with Sound Attenuated and Weatherproof Canopy and ATS system
4 Private Dept. for H.H.Shaikh Zayed Bin Sultan Al Nahyan - Abu Dhabi 1 x 135-150 KVA enclosed in SAC
4 x 100 KVA enclosed in SAC
7 x 60 KVA enclosed in SAC
5 Al Ain Shaikh Palace 1 x 500-550 KVA with ATS system
6 Office of Sheikh Hamden BinZayed Al Nahyan - Abu Dhabi 1 x 1500-1650 KVA Marapco Open type with Cables
7 RAK Gas - Ras Al Khaimah 5 x 1250 KVA with Sound Attenuated and Weatherproof canopy and Automatic Synchronization systems
Fuel Tanks 2 x 40,000L
8 Abu Dhabi Municipality 1 x 100-110 KVA with ATS Panel
1 x 70 KVA with ATS Panel
9 Abu Dhabi Army 1 x 135-150 KVA enclosed in SAC
3 x 100-110 KVA enclosed in SAC
2x 60-65 KVA enclosed in SAC
10 ASAB Gas Gathering and Injection Project - Abu Dhabi 5 x 500-550 KVA with Synchronizing system running in parallel for output of 2500 KVA Power Plant
11 Emirates Bank Outlets- Dubai 1 x 500-550 KVA
1 x 350-400 KVA
with Sound Attenuated and Weatherproof canopies and ATS systems
1 x 250-275 KVA Std. with ATS system
12 World Trade Centre - Retail Banking - Dubai 1 x 600-660 KVA with 6 ATS systems for UPS
13 Dubai Waterfront 2 x 1500 KVA LSAC
1 x 1000 KVA LSAC
1 x 500 KVA LSAC
with Automatic Synchronization system
Bulk Fuel Tanks 5 x 30,000 L
14 City Tower 2 - Dubai 1 x 500-550 KVA with ATS system
15 Lulu Tower - Sharjah 1 x 450-500 KVA with ATS System
16 Al Ain shopping mall 1 x 630-715 KVA with ATS system
1 x 250-275 KVA with ATS system
17 Hyundai Engg. - Dubai 20 x 150 KVA Marapco Open type
18 Palm Island - Dubai 1 x 550 KVA with ATS system
19 DCA Engg. facilities complex - Dubai 1 x350-400 KVA with ATS system
1 x 135-150 KVA with ATS system
20 Al Baddad Intl - Sharjah 15 x 60 KVA Marapco SAC
21 Beijing construction engineering group - Abu Dhabi 3 x 550 KVA Marapco
1 x 550 KVA JET
with Sound Attenuated and Weatherproof Canopies
22 Gulf Plastic Surgery Hospital - Dubai 1 x 75 KVA with ATS Panel
23 Inchape Shipping - Dubai 12 x 18 KVA Marapco
24 Leighton Contracting - Abu Dhabi 2 x 500 KVA Marapco with Sound Attenuated and Weatherproof Canopy with Installation
25 Formula 1-Seimens LLC - Abu Dhabi 1 x 1000-1100 KVA Marapco
26 CEBARCO WCT WLL - Abu Dhabi 2 x 400 KVA
2 x 275 KVA
7 x 220 KVA
2 x 150 KVA
2 x 100 KVA
5 x 60 KVA
Marapco with Sound Attenuated and Weatherproof Canopies
27 H.H.Rashid Al Makhtoum - Satwa Villa Project, Dubai 1 x 1000-1100 KVA with ATS Panel

Other Countries:

S.No. Project Name Country Project Details
1 MTC Telecom Sudan 72 x 30 KVA SA with ATS and Options
2 Farm of H.H.Prime Minister Qatar 1 x 1000 KVA
3 Iran Gelatine Capsules Factory Iran 3 x 800 KVA
2 x 500 KVA
4 Iraqi Ministry of Defence Southern Iraq 5 x 2000 KVA Silent and Synchronized
5 Qatar General Petroleum Co. Qatar 3 x 500 KVA in parallel for total output of 1500 KVA Power Plant
6 Greater Nile Petroleum Operating Sudan 3 x 250 KVA with Sound Proof Canopy
2 x 160 KVA with Sound Proof Canopy
1 x 100 KVA
7 MTC - Baghdad Iraq 160 x 60 KVA with Sound Attenuated and Weatherproof Canopy
8 Mobilink Pakistan 19 x 17.5 KVA
21 x 18 KVA
8 x 20 KVA
With Sound Attenuated and Weatherproof Canopies
14 x 20 KVA

 

 



Afghanistan


Afghanistan


Kuwait


Lebanon


Lebanon


Nigeria


United Arab Emirates


United Arab Emirates


United Arab Emirates


United Arab Emirates


United Arab Emirates


United Arab Emirates


Iraq

 

   

 